Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the popup-maker domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/theadvisorybox.com/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the unlimited-elements-for-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/theadvisorybox.com/httpdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/theadvisorybox.com/httpdocs/wp-includes/functions.php on line 6114
CASE STUDY 2 - The Advisory Box

CASE STUDY #2

Performance Management

DIFFICOLTA’ RISOLTA

OPPORTUNITA’ SBLOCCATA

Azienda Italiana operante nel settore dell’Ingegneria di Progetto / EPC per l’industria Oil&Gas con sedi Europa, Centro America e Central Asia, in periodo di crisi di risultati

SERVIZIO PRESTATO

  • Temporary Financial Transition Management
  • Gestione del turnaround
  • Gestione del cambiamento

OBIETTIVO RAGGIUNTO

  • Da oltre 2 mln di Euro di perdita a break even in 1 anno e mezzo

VANTAGGIO PER IL CLIENTE

  • Valore aziendale conservato
  • Nessun ulteriore assorbimento di capitale

INVESTIMENTO RICHIESTO

  • A Progetto: variabile secondo complessità
  • A fee periodica